Barge and new lift transported and launched simultaneously.
Preliminary lift leveling.
Setting lift.
Our low profile barge allows us to work under the lift without even dropping the rack.
Installing the cover.
Finishing touches of install.
Completed Job!
Barging equipment directly to site.
Installing panels.
Our dock barge is capable of floating up to 7000 lbs of cargo at 35 mph!
Completed Job!